欧美色综合久久久久久_18亚洲AV无码国产观看成人_2012中文字幕国语版_国产热の有码热の无码视频_天天爱天天做天天干

    Jiangsu Hongtong Petrochemical Equipment Co., Ltd. website welcome!

     
     Profile
     
    Contact 
      Jiangsu Hongtong Petrochemical Equipment
      Co., Ltd.
      Contact: Miss?Xiong
      Phone: 86-13338110818 86-13506182505
      Tel: 86-0510-80751858
      Fax: 86-0510-81010918
      Web: daiersi.com www.wxhtsh.com
      Email: wxhtsh@wxhtsh.com
      ???? ? ? 13338110818@163.com
      Add: No.8 Zhongxing Road, Zhuxi Industrial Park, Yixing, Wuxi City
     
       
       Dynamic
    Position:Home > Dynamic >
     

    Processing Technology of Sewage Energy Saving System

    The modern sewage treatment technology can be divided to primary, secondary and tertiary treatment based on the treatment degree. The sewage treatment degree is normally confirmed according to the water quality and water direction after treatment.

    Primary Treatment
    The primary treatment is mainly to remove the solid contaminants with the suspended state in the sewage. Most of physical treatment method can only meet the requirements of primary treatment. For the sewage after primary treatment, BOD can normally be removed about 30% and cannot meet the discharging standard. The primary standard belongs to the pretreatment of secondary treatment.
    Secondary Treatment
    The secondary treatment is mainly to remove the organic containments (BOD, COD) with the colloidal and dissolved state in the sewage. The removal rate can reach more than 90% so as to make the organic containment reach the discharging standard. The removal rate of suspended matters can reach 95% with good effluent results. 
    Tertiary Treatment
    The tertiary treatment can further process the dissolved inorganic matters leading to the water eutrophication such as the degradation-resistant organic matters, nitrogen and phosphorus. The main methods include the biological nitrogen and phosphorus removal method, coagulant sedimentation method, sand filtration method, active carbon adsorption, ion exchange method and electrodialysis method.

    The whole process is: the raw sewage thorough coarse grid enters into the grit basin via the grid or screen filter after lifted by the sewage lift pump and the sewage after grit-water separation enters into the primary sedimentation tank. The foregoing is the primary treatment (physical treatment). The effluent from the primary sedimentation tank enters into the biological treatment equipment. The activated sludge process and biofilm process are used (of which, there is aeration tank and oxidation ditch in the reactor with activated sludge process. The biofilm process includes the biofilter, biological rotating disc, biological contact oxidation process and biological fluidized bed). The effluent of biological treatment equipment enters into the secondary sedimentation tank. The effluent of secondary sedimentation tank is discharged or enters into the tertiary treatment after sterilization. The primary treatment ends and the secondary treatment starts. The tertiary treatment includes biological nitrogen and phosphorus removal, coagulant sedimentation, sand filtration method, active carbon adsorption method, ion exchange method and electrodialysis method. Parts of sludge in the secondary sedimentation tank flow back to the primary sedimentation tank or biological treatment equipment. Parts of sludge enter into the sludge thickening tank and then into the sludge digestion tank. After dehydration and drying equipment, the sludge is finally used. 
     


    Jiangsu Hongtong Petrochemical Equipment Co., Ltd.
    Tel:?86-0510-80751858 ?Fax:?86-0510-81010918
    Contact: Miss?Xiong ? Phone: 86-13338110818 86-13506182505
    Web:?daiersi.com ??www.wxhtsh.com
    Email:?wxhtsh@wxhtsh.com ??13338110818@163.com
    Add: No.8 Zhongxing Road, Zhuxi Industrial Park, Yixing, Wuxi City
    備案號: 蘇ICP備10083395號